
Image shown is a representation only. Exact specifications should be obtained from the product data sheet.



IMSA-11501S-25B-GFN1 | |
|---|---|
DigiKey Part Number | 2248-IMSA-11501S-25B-GFN1TR-ND - Tape & Reel (TR) 2248-IMSA-11501S-25B-GFN1CT-ND - Cut Tape (CT) |
Manufacturer | |
Manufacturer Product Number | IMSA-11501S-25B-GFN1 |
Description | CONN FFC BOTTOM 25POS 0.5MM R/A |
Manufacturer Standard Lead Time | 14 Weeks |
Customer Reference | |
Detailed Description | 25 Position FFC, FPC Connector Contacts, Bottom 0.020" (0.50mm) Surface Mount, Right Angle |
Datasheet | Datasheet |
Product Attributes
Filter Similar Products
Show Empty Attributes
Category | Height Above Board 0.134" (3.40mm) |
Manufacturer IRISO USA Inc. | Cable End Type Notched |
Series | Contact Material Copper Alloy |
Packaging Tape & Reel (TR) Cut Tape (CT) | Contact Finish Gold |
Part Status Active | Housing Material Liquid Crystal Polymer (LCP) |
Flat Flex Type FFC, FPC | Features Solder Retention |
Mounting Type Surface Mount, Right Angle | Voltage Rating 50V |
Connector/Contact Type Contacts, Bottom | Material Flammability Rating UL94 V-0 |
Number of Positions 25 | Current Rating (Amps) 0.5A |
Pitch 0.020" (0.50mm) | Housing Color Black |
Termination Solder | Base Product Number |
FFC, FCB Thickness 0.30mm |
Report Product Information Error
Documents & Media
Environmental & Export Classifications
Product Questions and Answers
Additional Resources
In-Stock: 0
Check Lead Time
Request Stock Notification
Quantity
All prices are in USD
Cut Tape (CT)
| Quantity | Unit Price | Ext Price |
|---|---|---|
| 1 | $1.61000 | $1.61 |
| 10 | $1.36800 | $13.68 |
| 25 | $1.28200 | $32.05 |
| 50 | $1.22060 | $61.03 |
| 100 | $1.16230 | $116.23 |
| 250 | $1.08948 | $272.37 |
| 500 | $1.03746 | $518.73 |
Tape & Reel (TR)
| Quantity | Unit Price | Ext Price |
|---|---|---|
| 1,500 | $0.96007 | $1,440.11 |
Tariff Status: Tariff may apply if shipping to the United States. Estimated tariff costs will be calculated and displayed in the shopping cart to help you assess potential expenses.