FMD0H334ZF is out of stock and can be placed on backorder.
Available Substitutes:

Parametric Equivalent


KEMET
In Stock: 0
Unit Price: $3.45000
Datasheet

Parametric Equivalent


KEMET
In Stock: 0
Unit Price: $3.59000
Datasheet
330 mF (EDLC) Supercapacitor 5.5 V Radial 25Ohm @ 1kHz 1000 Hrs @ 85°C
Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

FMD0H334ZF

DigiKey Part Number
399-FMD0H334ZF-ND
Manufacturer
Manufacturer Product Number
FMD0H334ZF
Description
CAP 330MF -20% +80% 5.5V T/H
Manufacturer Standard Lead Time
99 Weeks
Customer Reference
Detailed Description
330 mF (EDLC) Supercapacitor 5.5 V Radial 25Ohm @ 1kHz 1000 Hrs @ 85°C
Datasheet
 Datasheet
EDA/CAD Models
FMD0H334ZF Models
Product Attributes
Filter Similar Products
Category
Grade
Automotive
Manufacturer
KEMET
Qualification
AEC-Q200
Series
Termination
PC Pins
Packaging
Bulk
Mounting Type
Through Hole
Part Status
Active
Package / Case
Radial
Capacitance
330 mF
Lead Spacing
0.197" (5.00mm)
Tolerance
-20%, +80%
Size / Dimension
0.551" L x 0.354" W (14.00mm x 9.00mm)
Voltage - Rated
5.5 V
Height - Seated (Max)
0.610" (15.50mm)
ESR (Equivalent Series Resistance)
25Ohm @ 1kHz
Operating Temperature
-40°C ~ 85°C
Lifetime @ Temp.
1000 Hrs @ 85°C
Environmental & Export Classifications
Product Questions and Answers
Additional Resources
Substitutes (2)
Part NumberManufacturerQuantity AvailableDigiKey Part NumberUnit PriceSubstitute Type
FMU0H334ZFKEMET0399-FMU0H334ZF-ND$3.45000Parametric Equivalent
FMU0H334ZFTP18KEMET0399-FMU0H334ZFTP18CT-ND$3.59000Parametric Equivalent
In-Stock: 0
400 estimated in stock on 23-Sep-2027
Request Stock Notification
All prices are in USD
Bulk
QuantityUnit PriceExt Price
1$3.19000$3.19
10$2.23100$22.31
50$1.84960$92.48
400$1.55480$621.92
800$1.48905$1,191.24
1,200$1.45611$1,747.33
2,800$1.39824$3,915.07
5,200$1.36385$7,092.02
Tariff Status: Tariff may apply if shipping to the United States. Estimated tariff costs will be calculated and displayed in the shopping cart to help you assess potential expenses.