
Image shown is a representation only. Exact specifications should be obtained from the product data sheet.
RST 5-RKT 5-647/2M | |
|---|---|
DigiKey Part Number | 1794-1062-ND |
Manufacturer | |
Manufacturer Product Number | RST 5-RKT 5-647/2M |
Description | CIRC CBL 5POS RCPT TO PLUG 6.56' |
Manufacturer Standard Lead Time | 5 Weeks |
Customer Reference | |
Detailed Description | Circular Cable Assembly Unshielded 6.56' (2.00m) |
Datasheet | Datasheet |
Product Attributes
Filter Similar Products
Category | 2nd Connector Number of Positions 5 |
Manufacturer Lumberg Automation | 2nd Connector Number of Positions Loaded All |
Series | 2nd Connector Shell Size - Insert M12 |
Packaging Bulk | 2nd Connector Orientation Keyed |
Part Status Active | 2nd Connector Mounting Type Free Hanging (In-Line) |
1st Connector Type Receptacle | Length 6.56' (2.00m) |
1st Connector Gender Male Pins | Assembly Configuration Standard |
1st Connector Number of Positions 5 | Cable Type Round |
1st Connector Number of Positions Loaded All | Cable Material Polyvinyl Chloride (PVC) |
1st Connector Shell Size - Insert M12 | Color Gray |
1st Connector Orientation Keyed | Shielding Unshielded |
1st Connector Mounting Type Free Hanging (In-Line) | Ingress Protection IP68 - Dust Tight, Waterproof; NEMA 6 |
2nd Connector Type Plug | Usage Industrial Environments |
2nd Connector Gender Female Sockets | Base Product Number |
Report Product Information Error
Documents & Media
Environmental & Export Classifications
Product Questions and Answers
Additional Resources
In-Stock: 0
1 estimated in stock on 23-Oct-2026
Request Stock Notification
Quantity
All prices are in USD
Bulk
| Quantity | Unit Price | Ext Price |
|---|---|---|
| 1 | $43.51000 | $43.51 |
| 10 | $36.98500 | $369.85 |
| 25 | $34.67040 | $866.76 |
| 50 | $33.01680 | $1,650.84 |
| 100 | $31.44230 | $3,144.23 |
| 250 | $29.47652 | $7,369.13 |
Tariff Status: Tariff may apply if shipping to the United States. Estimated tariff costs will be calculated and displayed in the shopping cart to help you assess potential expenses.

