Red 8 Stud Spade Terminal Connector Crimp 18-22 AWG
Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PN18-8LF-3K

DigiKey Part Number
298-PN18-8LF-3KTR-ND - Tape & Reel (TR)
298-PN18-8LF-3KCT-ND - Cut Tape (CT)
Manufacturer
Manufacturer Product Number
PN18-8LF-3K
Description
CONN SPADE TERM 18-22AWG #8 RED
Manufacturer Standard Lead Time
6 Weeks
Customer Reference
Detailed Description
Red 8 Stud Spade Terminal Connector Crimp 18-22 AWG
Datasheet
 Datasheet
Product Attributes
Filter Similar Products
Show Empty Attributes
Category
Wire Gauge
18-22 AWG
Manufacturer
Panduit Corp
Insulation
Insulated
Series
Features
Serrated Termination
Packaging
Tape & Reel (TR)
Cut Tape (CT)
Color
Red
Part Status
Active
Contact Finish
Tin
Terminal Type
Spring, Snap
Contact Material
Copper
Stud/Tab Size
8 Stud
Insulation Diameter
0.080" ~ 0.145" (2.03mm ~ 3.68mm)
Width - Outer Edges
0.290" (7.37mm)
Material - Insulation
Polyamide (PA), Nylon
Length - Overall
0.890" (22.61mm)
Tongue Inside Opening
0.160" (4.06mm)
Mounting Type
Free Hanging (In-Line)
Base Product Number
Termination
Crimp
Environmental & Export Classifications
Product Questions and Answers
Additional Resources
Substitutes (1)
Part NumberManufacturerQuantity AvailableDigiKey Part NumberUnit PriceSubstitute Type
52410-1TE Connectivity AMP Connectors71A09041TR-ND$0.58000Similar
In-Stock: 2,682
Check for Additional Incoming Stock
All prices are in USD
Cut Tape (CT)
QuantityUnit PriceExt Price
1$0.65000$0.65
10$0.60900$6.09
25$0.59200$14.80
50$0.57920$28.96
100$0.56670$56.67
250$0.55060$137.65
500$0.53872$269.36
1,000$0.52711$527.11
Tape & Reel (TR)
QuantityUnit PriceExt Price
3,000$0.43281$1,298.43
6,000$0.42345$2,540.70
9,000$0.41806$3,762.54
15,000$0.41137$6,170.55
21,000$0.40702$8,547.42
30,000$0.40245$12,073.50
75,000$0.39094$29,320.50
150,000$0.38244$57,366.00
Tariff Status: Tariff may apply if shipping to the United States. Estimated tariff costs will be calculated and displayed in the shopping cart to help you assess potential expenses.