SCT4018KEC11 is out of stock and can be placed on backorder.
Available Substitutes:
Similar
Similar

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.


SCT4018KEC11 | |
|---|---|
DigiKey Part Number | 846-SCT4018KEC11-ND |
Manufacturer | |
Manufacturer Product Number | SCT4018KEC11 |
Description | 1200V, 81A, 3-PIN THD, TRENCH-ST |
Manufacturer Standard Lead Time | 27 Weeks |
Customer Reference | |
Detailed Description | N-Channel 1200 V 81A (Tj) 312W Through Hole TO-247N |
Datasheet | Datasheet |
Product Attributes
Filter Similar Products
Show Empty Attributes
Category | Vgs(th) (Max) @ Id 4.8V @ 22.2mA |
Mfr | Gate Charge (Qg) (Max) @ Vgs 170 nC @ 18 V |
Packaging Tube | Vgs (Max) +21V, -4V |
Part Status Active | Input Capacitance (Ciss) (Max) @ Vds 4532 pF @ 800 V |
FET Type | Power Dissipation (Max) 312W |
Technology | Operating Temperature 175°C (TJ) |
Drain to Source Voltage (Vdss) 1200 V | Mounting Type Through Hole |
Current - Continuous Drain (Id) @ 25°C | Supplier Device Package TO-247N |
Drive Voltage (Max Rds On, Min Rds On) 18V | Package / Case |
Rds On (Max) @ Id, Vgs 23.4mOhm @ 42A, 18V |
Report Product Information Error
Documents & Media
Environmental & Export Classifications
Product Questions and Answers
Additional Resources
Substitutes (2)
| Part Number | Manufacturer | Quantity Available | DigiKey Part Number | Unit Price | Substitute Type |
|---|---|---|---|---|---|
| DMWSH120H18HM3 | Diodes Incorporated | 0 | 31-DMWSH120H18HM3-ND | $28.27000 | Similar |
| DMWSH120H28SM3 | Diodes Incorporated | 0 | 31-DMWSH120H28SM3-ND | $27.29000 | Similar |
In-Stock: 0
30 estimated in stock on 01-Apr-2027
Request Stock Notification
Quantity
All prices are in USD
Tube
| Quantity | Unit Price | Ext Price |
|---|---|---|
| 1 | $23.12000 | $23.12 |
| 30 | $18.80500 | $564.15 |
| 120 | $18.06775 | $2,168.13 |
Tariff Status: Tariff may apply if shipping to the United States. Estimated tariff costs will be calculated and displayed in the shopping cart to help you assess potential expenses.


