511BBA156M250AAGR is out of stock and can be placed on backorder.
Available Substitutes:
Direct
Direct
Direct
Direct
Direct
Direct
Direct
New at DigiKey

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.
511BBA156M250AAGR | |
|---|---|
DigiKey Part Number | 863-511BBA156M250AAGR-ND |
Manufacturer | |
Manufacturer Part Number | 511BBA156M250AAGR |
Description | XTAL OSC XO 156.2500MHZ LVDS SMD |
Customer Reference | |
Detailed Description | 156.25 MHz XO (Standard) LVDS Oscillator 3.3V Enable/Disable 6-SMD, No Lead |
Product Attributes
Filter Similar Products
Show Empty Attributes
Category | Voltage - Supply 3.3V |
Mfr | Frequency Stability ±25ppm |
Series | Operating Temperature -40°C ~ 85°C |
Packaging Strip | Current - Supply (Max) 23mA |
Part Status Active | Mounting Type Surface Mount |
Base Resonator | Package / Case 6-SMD, No Lead |
Type | Supplier Device Package 6-SMD (7x5) |
Frequency | Size / Dimension 0.276" L x 0.197" W (7.00mm x 5.00mm) |
Function Enable/Disable | Height - Seated (Max) 0.071" (1.80mm) |
Output LVDS | Current - Supply (Disable) (Max) 18mA |
Report Product Information Error
Environmental & Export Classifications
Product Questions and Answers
Additional Resources
Substitutes (7)
| Part Number | Manufacturer | Quantity Available | DigiKey Part Number | Unit Price | Substitute Type |
|---|---|---|---|---|---|
| 637L15625I3T | CTS-Frequency Controls | 0 | 637L15625I3T-ND | $3.36571 | Direct |
| 637V15625I3T | CTS-Frequency Controls | 0 | 637V15625I3T-ND | $3.36571 | Direct |
| 638L15625I3T | CTS-Frequency Controls | 0 | 638L15625I3T-ND | $3.70775 | Direct |
| 638V15625I3T | CTS-Frequency Controls | 0 | 638V15625I3T-ND | $3.70775 | Direct |
| 656L15625I3T | CTS-Frequency Controls | 0 | 656L15625I3T-ND | $2.68013 | Direct |
Show More
Value Added Item
1 estimated in stock on 20-Nov-2026
Tariff Status: Tariff may apply if shipping to the United States. Estimated tariff costs will be calculated and displayed in the shopping cart to help you assess potential expenses.




