Flip Flop 2 Element D-Type 1 Bit Positive Edge 14-WFQFN Exposed Pad
Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

SN74LVC74ABQAR

DigiKey Part Number
296-SN74LVC74ABQARTR-ND - Tape & Reel (TR)
296-SN74LVC74ABQARCT-ND - Cut Tape (CT)
296-SN74LVC74ABQARDKR-ND - Digi-Reel®
Manufacturer
Manufacturer Part Number
SN74LVC74ABQAR
Description
IC FF D-TYPE DBL 1-BIT 14-WQFN
Manufacturer Standard Lead Time
12 Weeks
Customer Reference
Detailed Description
Flip Flop 2 Element D-Type 1 Bit Positive Edge 14-WFQFN Exposed Pad
Datasheet
 Datasheet
Product Attributes
Filter Similar Products
Show Empty Attributes
Category
Max Propagation Delay @ V, Max CL
5.2ns @ 3.3V, 50pF
Manufacturer
Texas Instruments
Trigger Type
Positive Edge
Series
Current - Output High, Low
24mA, 24mA
Packaging
Tape & Reel (TR)
Cut Tape (CT)
Digi-Reel®
Voltage - Supply
1.65V ~ 3.6V
Part Status
Active
Current - Quiescent (Iq)
10 µA
Function
Set(Preset) and Reset
Input Capacitance
5 pF
Type
D-Type
Operating Temperature
-40°C ~ 125°C (TA)
Output Type
Complementary
Mounting Type
Surface Mount
Number of Elements
2
Supplier Device Package
14-WQFN (3x2.5)
Number of Bits per Element
1
Package / Case
14-WFQFN Exposed Pad
Clock Frequency
100 MHz
Environmental & Export Classifications
Product Questions and Answers
Additional Resources
In-Stock: 0
3,000 estimated in stock on 04-Feb-2027
Request Stock Notification
All prices are in USD
Cut Tape (CT) & Digi-Reel®
QuantityUnit PriceExt Price
1$0.29000$0.29
10$0.19600$1.96
25$0.17360$4.34
100$0.14920$14.92
250$0.13752$34.38
500$0.13046$65.23
1,000$0.12464$124.64
* All Digi-Reel orders will add a $7.00 reeling fee.
Tape & Reel (TR)
QuantityUnit PriceExt Price
3,000$0.11746$352.38
6,000$0.11394$683.64
9,000$0.11218$1,009.62
15,000$0.11023$1,653.45
21,000$0.10909$2,290.89
30,000$0.10799$3,239.70
75,000$0.10563$7,922.25
Tariff Status: Tariff may apply if shipping to the United States. Estimated tariff costs will be calculated and displayed in the shopping cart to help you assess potential expenses.