RS2A-E3/52T is available for purchase but is not normally stocked.
Available Substitutes:

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.
RS2A-E3/52T | |
|---|---|
DigiKey Part Number | RS2A-E3/52T-ND - Tape & Reel (TR) |
Manufacturer | |
Manufacturer Part Number | RS2A-E3/52T |
Description | DIODE STANDARD 50V 1.5A DO214AA |
Manufacturer Standard Lead Time | 5 Weeks |
Customer Reference | |
Detailed Description | Diode 50 V 1.5A Surface Mount DO-214AA (SMB) |
Datasheet | Datasheet |
Product Attributes
Filter Similar Products
Show Empty Attributes
Category | Reverse Recovery Time (trr) 150 ns |
Mfr | Current - Reverse Leakage @ Vr 5 µA @ 50 V |
Packaging Tape & Reel (TR) | Capacitance @ Vr, F 20pF @ 4V, 1MHz |
Part Status Active | Mounting Type |
Technology | Package / Case |
Voltage - DC Reverse (Vr) (Max) 50 V | Supplier Device Package DO-214AA (SMB) |
Current - Average Rectified (Io) 1.5A | Operating Temperature - Junction -55°C ~ 150°C |
Voltage - Forward (Vf) (Max) @ If 1.3 V @ 1.5 A | Base Product Number |
Speed Fast Recovery =< 500ns, > 200mA (Io) |
Report Product Information Error
Documents & Media
Environmental & Export Classifications
Product Questions and Answers
Additional Resources
Substitutes (4)
| Part Number | Manufacturer | Quantity Available | DigiKey Part Number | Unit Price | Substitute Type |
|---|---|---|---|---|---|
| RS2A-13-F | Diodes Incorporated | 1,039 | 31-RS2A-13-FTR-ND | $0.46000 | Upgrade |
| S2A-13-F | Diodes Incorporated | 0 | S2A-FDITR-ND | $0.38000 | Similar |
| SURS8105T3G-VF01 | onsemi | 0 | SURS8105T3G-VF01-ND | $0.00000 | Similar |
| STPS3L60U | STMicroelectronics | 0 | 497-6584-2-ND | $0.49000 | Direct |
Available To Order
Check Lead Time
Quantity
All prices are in USD
Tape & Reel (TR)
| Quantity | Unit Price | Ext Price |
|---|---|---|
| 3,000 | $0.12250 | $367.50 |
Tariff Status: Tariff may apply if shipping to the United States. Estimated tariff costs will be calculated and displayed in the shopping cart to help you assess potential expenses.





