
Image shown is a representation only. Exact specifications should be obtained from the product data sheet.



691508110305 | |
|---|---|
DigiKey Part Number | 732-5966-2-ND - Tape & Reel (TR) 732-5966-1-ND - Cut Tape (CT) 732-5966-6-ND - Digi-Reel® |
Manufacturer | |
Manufacturer Product Number | 691508110305 |
Description | TERM BLOCK 5POS 3.5MM SMD |
Manufacturer Standard Lead Time | 12 Weeks |
Customer Reference | |
Detailed Description | 5 Position Wire to Board Terminal Block Horizontal and Vertical with Board 0.138" (3.50mm) Surface Mount |
Datasheet | Datasheet |
EDA/CAD Models | 691508110305 Models |
Product Attributes
Filter Similar Products
Category | Mounting Type Surface Mount |
Manufacturer Würth Elektronik | Wire Termination Screw - Rising Cage Clamp |
Series | Features Board Guide, Mounting Flange |
Packaging Tape & Reel (TR) Cut Tape (CT) Digi-Reel® | Color Black |
Part Status Active | Operating Temperature -40°C ~ 130°C |
Number of Levels 1 | Housing Material Liquid Crystal Polymer (LCP) |
Positions Per Level 5 | Contact Material - Plating Tin |
Pitch 0.138" (3.50mm) | Clamp Material - Plating Brass - Tin Plated |
Mating Orientation Horizontal and Vertical with Board | Screw Material - Plating Steel - Zinc Plated |
Current 10 A | Torque - Screw 0.2 Nm (1.7 Lb-In) |
Voltage 300 V | Screw Thread M2 |
Wire Gauge 16-30 AWG |
Report Product Information Error
Documents & Media
Environmental & Export Classifications
Product Questions and Answers
Additional Resources
In-Stock: 0
150 estimated in stock on 21-Dec-2026
Request Stock Notification
Quantity
All prices are in USD
Cut Tape (CT) & Digi-Reel®
| Quantity | Unit Price | Ext Price |
|---|---|---|
| 1 | $6.83000 | $6.83 |
| 10 | $6.04300 | $60.43 |
| 50 | $5.25600 | $262.80 |
Tape & Reel (TR)
| Quantity | Unit Price | Ext Price |
|---|---|---|
| 150 | $3.73860 | $560.79 |
| 300 | $3.39930 | $1,019.79 |
Tariff Status: Tariff may apply if shipping to the United States. Estimated tariff costs will be calculated and displayed in the shopping cart to help you assess potential expenses.



