Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6
Slide 7
Slide 8
Slide 9
Slide 10
Slide 11
Slide 12
Slide 13
Slide 14
Slide 15
Slide 16
Slide 17
Product List
The nut now comes pre-assembled on the housing and the grommet and strain relief are one piece. Should somebody make a mistake on the assembly procedure, it is possible to extract the contact and start over. The label with the warning not to disconnect under load is then applied to make the lead compliant to NEC code.
PTM Published on: 2011-11-03