Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6
Slide 7
Slide 8
Slide 9
Slide 10
Slide 11
Slide 12
Slide 13
Slide 14
Slide 15
Slide 16
Slide 17
Slide 18
Slide 19
Slide 20
Slide 21
Slide 22
Slide 23
Slide 24
Slide 25
Slide 26
Slide 27
Slide 28
Slide 29
Slide 30
Slide 31
Product List
ATP follows SDA guidelines to eliminate issues related to unreliable supply voltage power up time. Supply ramp up time is when the power reaches the operating level and the time to wait until the SD card can accept the first CMD. Stable power supply after reaching the minimum supply voltage is required for reliable SD card operation.
PTM Published on: 2015-10-20