Shown on this slide is the sequencer connection which enables the decision of whether to enable the 3.3 V rail to power up first and then the 1.8 V rail or vice-versa. This also handles the shutdown sequencing in the same manner. Refer to table 1 in Application Report SBVA030 for the proper logic level required for various C2000 controllers.
PTM Published on: 2012-03-26